AUTOMATION INDUSTRY
In automation projects, many different skills are often needed to produce a machine where all parts work together. It’s everything from requirements management to design, programming, control engineering and documentation. We offer it all, separately or together. The machines that Svekon develops are CE marked and carefully documented. We write a complete documentation and also hold training on the machine for the customer
We have delivered automation machines in process, workshop and life science, all based on a requirement specification created in close collaboration with the customer and with the end-user in mind. After developing a concept and layout to suit the client, we work towards three key milestones – Design Review, FAT and SAT.
The design review takes place before the actual production starts, to ensure that we are on the right track. Under FAT – Factory Acceptance Test – we test the machine under production-like conditions in Svekon’s premises. Once the FAT is approved, the machine is sent to the customer. We also perform a so-called SAT – Site Acceptance Test -, where the machine is tested in the right environment. Once the SAT is approved, the machine is ready for use. All three sub-objectives are checked against the requirements specification established before the start of the project.